Nogales Produce Headquarters

Concurrent renovation and upgrade to offices and all warehouse lighting, power and mechanical system power. A major portion of work involved changing the 10-cooler and freezer cooling system for the warehouse powered with a new 1,600A emergency switch board.

Greenway Office Building

New construction of a multibuilding office park. Prism served as the electrical contractor.  

Erchonia

Ground up construction of a warehouse, manufacturing and administrative office space.

GameStop Headquarters

The GameSop Headquarters included the finish out of a 360,000 sf building and a 60,000 sf addition. The Prism team installed a new electrical distribution system with two 6,000A, 277/480 volt primary switchboards, one 500 KW Unit substation, one 800 KW generator, one 300 KW UPS system, 15 distribution panel More »

Park Lane

New construction mixed-use development including 750,000 sf retail, 336,000 sf office, 500,000 sf residential and 200-room hotel on 33 acres.  

Capital One

450,000 SF in a corporate campus that includes 2000A 277/480V 3PH service to each of three buildings, two garages, and extensive site work built over 12 months. Each of the three buildings was designed and equipped with an Emergency Standby Generator. The extensive site work consisted of 2,000 feet of More »

Baylor Scott & White Marble Falls

This 200,000 square foot facility is currently under construction and will house 46 medical/surgical and intensive care unit beds with future plans to accommodate an additional 80 beds to keep pace with demand for inpatient care. Diagnostic services, laboratories, obstetrics, surgery services, a pharmacy, an emergency department and much more More »

Scott & White College Station

Scott & White Hospital and Medical Office Building in College Station is a 5-story, 143-bed acute care hospital that houses an emergency department, cardiac services including cardiac catheterization labs, neonatal intensive care unit, comprehensive cancer services, operating rooms, maternity services suites, endoscopic procedure suites, inter-operative robotics, and other specialty services. More »

UNT Rawlins Hall

New construction and duct bank relocation for the new Rawlins Hall on the UNT campus. This residence hall houses the UNT honors students.  

Good Shepherd Episcopal School

New construction elementary school. This project is certified LEED Silver.

Ursuline Academy Arts Building

New construction of 69,000 sf LEED project with 2,000 amp utility SeNice. Relocated two utility SeNice transformers, added a SeNice tap can to re-feed five separate building feeds within one week to reduce normal power loss to school before teachers and students returned.

Da Vinci School

New construction of a 20,730 SF single story building with solar panels, wind turbine and renewable energy. This project is certified LEED Gold.