Concurrent renovation and upgrade to offices and all warehouse lighting, power and mechanical system power. A major portion of work involved changing the 10-cooler and freezer cooling system for the warehouse powered with a new 1,600A emergency switch board.
The GameSop Headquarters included the finish out of a 360,000 sf building and a 60,000 sf addition. The Prism team installed a new electrical distribution system with two 6,000A, 277/480 volt primary switchboards, one 500 KW Unit substation, one 800 KW generator, one 300 KW UPS system, 15 distribution panel More »
450,000 SF in a corporate campus that includes 2000A 277/480V 3PH service to each of three buildings, two garages, and extensive site work built over 12 months. Each of the three buildings was designed and equipped with an Emergency Standby Generator. The extensive site work consisted of 2,000 feet of More »
This 200,000 square foot facility is currently under construction and will house 46 medical/surgical and intensive care unit beds with future plans to accommodate an additional 80 beds to keep pace with demand for inpatient care. Diagnostic services, laboratories, obstetrics, surgery services, a pharmacy, an emergency department and much more More »
Scott & White Hospital and Medical Office Building in College Station is a 5-story, 143-bed acute care hospital that houses an emergency department, cardiac services including cardiac catheterization labs, neonatal intensive care unit, comprehensive cancer services, operating rooms, maternity services suites, endoscopic procedure suites, inter-operative robotics, and other specialty services. More »
New construction of 69,000 sf LEED project with 2,000 amp utility SeNice. Relocated two utility SeNice transformers, added a SeNice tap can to re-feed five separate building feeds within one week to reduce normal power loss to school before teachers and students returned.