Prefabrication

The HUB: Build Smarter, Faster, Safer

Our brand new, 30,000-square-foot state-of-the-art prefabrication facility isn’t just about efficiency today, it’s an investment in a smarter future for electrical construction. This expansion allows us to install a larger assembly line, further enhancing our ability to serve your electrical contractor needs.

The HUB

Smarter Building Starts from the Blueprint

Prism’s commitment to building smarter with The HUB starts even before prefabrication begins. We use a unique approach called “standard delivery methodology.” Here’s what that means for you:

  • Early Collaboration

    Our project team, including preconstruction specialists and BIM modeling experts, works with you from the outset.

  • Project Breakdown

    Together, we break down your project’s construction phases into manageable components.

  • Identifying Prefabrication Opportunities

    Throughout this process, our team identifies opportunities where prefabrication can benefit your project timeline and overall success.

This collaborative approach ensures we leverage the power of The HUB from the very beginning, maximizing the potential for faster project completion, improved efficiency, and reduced costs.

How The HUB Delivers on its Promise

  • Minimize Waste and Maximize Efficiency

    Indoor assembly allows for improved material handling and organization, reducing jobsite waste. This translates to a streamlined process – the off-site approach frees up valuable space on your jobsite and minimizes environmental impact.

  • Superior Quality Control with Reduced Risk

    The controlled environment of our facility minimizes external factors that can impact product quality. This ensures consistent, superior prefabricated components for you, and optimized handling procedures reduce the risk of damage during storage and transport.

  • Enhanced Safety for Everyone

    Moving assembly indoors creates a safer work environment for everyone, minimizing potential risks associated with traditional jobsite settings. This controlled environment fosters worker safety and well-being.

  • Synchronized Success with Parallel Construction

    While our field teams are actively installing components on-site, our dedicated facility is simultaneously building parts for future phases of the project. This allows us to maximize resource utilization, accelerate project timelines, improve coordination, and reduce disruptions.

Prism’s HUB is more than just prefabrication – it’s a smarter way to build.

Prism Electric logo

BAYLOR SCOTT & WHITE

PREFABRICATION EXCELLENCE: DELIVERING VALUE FROM THE START

Case Study

BAYLOR SCOTT & WHITE

PREFABRICATION EXCELLENCE: DELIVERING VALUE FROM THE START

Prism Electric’s 15-month design assist with Baylor Scott & White on their Frisco project showcases our commitment to early-stage project collaboration. Through regular design meetings, we collaborated closely with the design team, identifying potential challenges early on and uncovering opportunities to reduce costs.

Our Proven Process

Prism Electric’s approach to prefabrication is built on planning, collaboration, and precision. For the Baylor Scott & White – Frisco project, we worked closely with the design and construction teams from the outset, identifying the components best suited for prefabrication. This allowed us to integrate prefabrication early in the process, driving efficiency throughout the construction phase.

Our prefabrication process ensures consistency, precision, and quality in every component. By assembling complex systems in a controlled environment, we reduce the chance of errors and rework, which can be common in on-site fabrication.

Key Achievements

  • Prefabrication of Electrical Components: We leveraged our prefabrication capabilities to produce key electrical elements off-site, including electrical panels, underground duct banks, and in-wall devices, significantly speeding up installation while reducing on-site labor costs.
  • Optimized Installation Process: By preassembling critical components in our controlled environment, we minimized the risk of errors, improving precision and allowing for quicker, more efficient installation once on-site.
  • Improved Safety and Reduced Labor Costs: Off-site prefabrication reduced the need for extensive on-site labor, enhancing safety conditions and lowering labor-related expenses, directly benefiting the project’s overall budget.
  • Streamlined Delivery Schedule: With many components prepared in advance, we kept the project on schedule, avoiding potential delays caused by on-site fabrication.

Key Benefits for Clients

  • Cost Savings: Prefabricating components off-site leads to fewer labor hours on-site, reducing labor costs and lowering the overall project budget.
  • Timely Delivery: Prefabrication ensures that critical components are ready for installation when needed, keeping the project on schedule and avoiding delays.
  • Enhanced Quality and Precision: The controlled environment of off-site prefabrication enables higher precision in manufacturing, reducing the risk of on-site errors and rework.
  • Reduced On-Site Disruption: By minimizing the amount of fabrication needed on-site, we improve safety conditions and reduce disruption to other trades, keeping the job site more organized and efficient.

In addition to Preconstruction services performed by Prism Electric, we also took the lead in Preconstruction and Virtual Design services for this project.

Preconstruction Case Study Virtual Design Case Study

Prefabrication is more than a time-saver; it’s a strategic advantage. At Prism Electric, our prefabrication services help you reduce costs, ensure timely project delivery, and improve overall quality, driving success from the ground up.