This project includes the ground up construction of the Winstar Casino which includes a state of the art lighting system and central water fountain feature. The fountain is equipped with technology to produce special water and light shows synced to music.
The third phase of Prism’s involvement with the Winstar include renovations to the original casino to upgrade lighting and sound capabilities. This project also includes the enhancement of food preparation and service areas including a food court, buffet and kitchen areas. Prism’s scope includes: Design review/recommendations including budgeting and reviewing More »
The second project for Prism at Winstar was the 12-story, 395 room hotel. The project included a restaurant, lounge, ballroom and conference space. Prism’s scope included: Design review/recommendations Budgeting Review existing installation Coordination with owner/subcontractors Electrical construction Reworked and cleaned main service Rebuilt/updated existing electrical installations New electrical room One-line and record More »
Construction recently wrapped up on this 300+ room hotel project, located within the Bridge Street at McKinney Crossing mixed-use development. Features of the project include a full service restaurant, conference facilities, a ballroom, fitness center and pool.
This project includes the ground-up construction of a second hotel adjacent to the existing casino and hotel. The project also includes a restaurant, lounge, ballroom and conference space.
This project included the fast track renovation of the south casino gaming area within two months. Additional aspects of the project include a pool bar, theater, hotel tower on the north side of the property and a renovation of the north casino gaming area.
This project consists of an 82,000 SF addition to the Dell Children’s Medical Center of Central Texas in Austin. The project was completed in the operational facility. The end project achieved LEED Platinum for Healthcare – the first project in the nation to achieve such designation.
Renovation and upgrade of all electrical systems. This project is taking place in a fully operational hospital with highly coordinated redundancy systems and tie ins.
This project included shell construction and finish out of the new Cancer Center along with remodelling and renovating a 100-plus-year-old existing Collins Hospital. The Baylor Sammons Collins project required the integration of the two existing 250,000 SF inpatient care buildings with a new 500,000 SF outpatient cancer center. The project earned LEED Gold certification.
Seton Healthcare Family in Austin, Texas is planning a new teaching hospital in conjunction with the University of Texas at Austin Medical School The project is scheduled to be an approximate 530,000 s.f. new, acute care hospital, a skybridge connecting the new hospital to the existing parking garage, and new elevators at the existing More »