United Copper

New construction of a facility housing manufacturing, distribution warehouse and office space.

Paslode Distribution Facility

This project includes a 145,000 sf addition to an existing 68,500 sf building. A new 3,000A service was added including a new main switchboard, gear line-up and almost 500 feet of 600A busway. This project was completed on a tight six-month schedule and the facility was occupied throughout the entire More »

Nogales Produce

This was a concurrent renovation and upgrade to offices and all warehouse lighting, power and mechanical system power. A major portion of the work involved changing the 10-cooler and freezer cooling system for the warehouse powered with a new 1,600A emergency switch board.

KFS

New construction of an industrial facility.

GameStop

This project includes the finish out of a 360,000 sf building and a 60,000 sf addition. The scope included installing a new electrical distribution system with two 6,000A, 277/480 volt primary switchboards, one 500 KW Unit substation, one 800 KW generator, one 300 KW UPS system, 15 distribution panel boards, More »

DW Distribution

New construction of a 44,500 sf distribution center.

Hays County Government Center

Three-stories with 252,000 sf including 10-court rooms, security sally-port with men’s and women’s holding areas and office space for approximately 800 people.  

Ellis County Courthouse

The Ellis County Courthouse is a 200,000 sf new construction with four court rooms, holding cells, county offices and a three level parking garage. The 16,000 sf jail expansion includes six inmate pods, control station, kitchen, jail personnel covered parking and transferred 911 dispatch.

North Richland Hills Municipal Building

New courthouse and detention center for the municipality of North Richland Hills. Prism provided design-assist services for their project including cutting edge audio-visual components for the deposition and meeting rooms.

Grand Prairie YMCA Addition

New addition consisting of a basketball gym, weight lifting facility, aerobics room, locker rooms, receptionist area, and storage areas as well as a new parking lot addition with pole lights and exterior lighting. The renovation portion consists of remodeling the existing rooms into a large child watch area, administrative area, More »

Reliant Stadium Screen

The Reliant Stadium Screen consists of a series of connected boards each measuring 52 feet high by 277 feet wide for a total of 14,549 feet packed with 5.28 million pixels. Prism provided conduit, cabling and electrical connections for this impressive screen and our service division is on site at More »

Texas Motor Speedway HD Video Screen (Big Hoss)

Big Hoss stands 12-stories high and provides 20,633.34 sf of HD video viewing. Prism Electric is proud to be associated with this record-breaking screen and installation was completed just in time for its debut.