Hays County Government Center
Three-stories with 252,000 sf including 10-court rooms, security sally-port with men’s and women’s holding areas and office space for approximately 800 people.
Three-stories with 252,000 sf including 10-court rooms, security sally-port with men’s and women’s holding areas and office space for approximately 800 people.
The Ellis County Courthouse is a 200,000 sf new construction with four court rooms, holding cells, county offices and a three level parking garage. The 16,000 sf jail expansion includes six inmate pods, control station, kitchen, jail personnel covered parking and transferred 911 dispatch.
New courthouse and detention center for the municipality of North Richland Hills. Prism provided design-assist services for their project including cutting edge audio-visual components for the deposition and meeting rooms.
New addition consisting of a basketball gym, weight lifting facility, aerobics room, locker rooms, receptionist area, and storage areas as well as a new parking lot addition with pole lights and exterior lighting. The renovation portion consists of remodeling the existing rooms into a large child watch area, administrative area, More »
The Reliant Stadium Screen consists of a series of connected boards each measuring 52 feet high by 277 feet wide for a total of 14,549 feet packed with 5.28 million pixels. Prism provided conduit, cabling and electrical connections for this impressive screen and our service division is on site at More »
Big Hoss stands 12-stories high and provides 20,633.34 sf of HD video viewing. Prism Electric is proud to be associated with this record-breaking screen and installation was completed just in time for its debut.
This 168-by-72-foot scoreboard was developed by Mitsubishi’s Diamond Vision Systems and stretches from 20 yard line to 20 yard line. Prism Electric provided conduit, cabling and electrical connections for the giant center-hung HD screens. Prism also provided electrical services when the entire structure was raised to allow for U2’s set More »
Ground up construction of the tilt wall, data center. Prism’s scope also included all site lighting.
This project was accomplished at the same time as the 5th and 6th floor vertical expansion. The CUP includes state-of-the-art chillers, boilers and heat-exchanging equipment, and two large electric rooms for normal and emergency power. Three York chillers are in operation, with room to expand to five, as well as three steam-generating More »
The New South Central Utility Plant is designed for future expansion of Baylor University Medical Center Dallas. This SCUP receives from the utility company a dual source of 5000 amps @ 600 volts to the Main-Tie-Main Switchboard. This Switchboard feeds normal power to three 2000 amp ATS’s. The Emergency Power More »
This project consists of a remodel/renovation for an operational annex data center. Located on the Baylor University Medical Center campus in Dallas, maintaining full functionality of all systems on the healthcare campus was of critical importance.
This project is known as a POD Expansion, Hewlett Packard Performance Optimized Datacenter (POD). Not a typical white floor space building, everything within the data center is contained within the building container. When complete, it goes to the client as part of a complete data center solution, with services available More »