Cowboys Stadium HD Video Screen

This 168-by-72-foot scoreboard was developed by Mitsubishi’s Diamond Vision Systems and stretches from 20 yard line to 20 yard line. Prism Electric provided conduit, cabling and electrical connections for the giant center-hung HD screens. Prism also provided electrical services when the entire structure was raised to allow for U2’s set More »

Hewlett Packard POD 2

This project is known as a POD Expansion, Hewlett Packard Performance Optimized Datacenter (POD). Not a typical white floor space building, everything within the data center is contained within the building container. When complete, it goes to the client as part of a complete data center solution, with services available More »

Winstar World Casino

This project includes the ground up construction of the Winstar Casino which includes a state of the art lighting system and central water fountain feature. The fountain is equipped with technology to produce special water and light shows synced to music.

Winstar World Casino Renovation

The third phase of Prism’s involvement with the Winstar include renovations to the original casino to upgrade lighting and sound capabilities. This project also includes the enhancement of food preparation and service areas including a food court, buffet and kitchen areas. Prism’s scope includes: Design review/recommendations including budgeting and reviewing More »

Winstar Hotel I

The second project for Prism at Winstar was the 12-story, 395 room hotel. The project included a restaurant, lounge, ballroom and conference space. Prism’s scope included: Design review/recommendations Budgeting Review existing installation Coordination with owner/subcontractors Electrical construction Reworked and cleaned main service Rebuilt/updated existing electrical installations New electrical room One-line and record More »

Gateway McKinney Sheraton

Construction recently wrapped up on this 300+ room hotel project, located within the Bridge Street at McKinney Crossing mixed-use development. Features of the project include a full service restaurant, conference facilities, a ballroom, fitness center and pool.

Winstar Hotel Tower II

This project includes the ground-up construction of a third hotel tower adjacent to the existing casino and hotel, adding 300+ rooms.

Winstar Hotel Tower III

This project includes the ground-up construction of a second hotel adjacent to the existing casino and hotel. The project also includes a restaurant, lounge, ballroom and conference space.

Choctaw Casino Resort Expansion

This project included the fast track renovation of the south casino gaming area within two months. Additional aspects of the project include a pool bar, theater, hotel tower on the north side of the property and a renovation of the north casino gaming area.

Dell Children’s Third Bed Tower Addition

This project consists of an 82,000 SF addition to the Dell Children’s Medical Center of Central Texas in Austin. The project was completed in the operational facility. The end project achieved LEED Platinum for Healthcare – the first project in the nation to achieve such designation.