The Austin Veterinary Emergency & Specialty Center is a 48,000-square-foot, two-story advanced veterinary specialty hospital featuring some of the most sophisticated medical infrastructure in Texas. This adaptive reuse project transformed an aging commercial shell into a state-of-the-art facility housing emergency care, surgery, radiology, neurology, and interventional procedures with electrical demands More »
The Bistro project involved delivering the complete electrical scope for a high-end restaurant located within the tallest building in Austin at the time of construction. This work required precision installation, meticulous quality control, and extensive coordination with the general contractor, design team, and specialty manufacturers to achieve the project’s demanding More »
The fourth patient tower will add 72 rooms for acute care and allow Dell Children’s to serve an additional 1,500 patients each year. The tower consists of: 24 beds for new Pediatric Intensive care Unit (PICU) 24 beds for in-patient Oncology/Hematology 24 beds for Acute Care including a simulation lab More »
The Austin Marriott downtown hotel consists of 30-stories, 588-rooms and three levels of below grade parking. In addition, this project includes 60,000 sq.ft. of meeting and convention space. Completely prefabricated exterior skin panels were used to create the skin’s first layer of waterproofing and temporary weather seal to protect the More »
The Moody Center is a multi-purpose arena on the campus of the University of Texas at Austin. This arena replaces the Frank Erwin Center and stands on a former parking lot located immediately south of UT’s soccer | track and field venue, Mike A. Myers Stadium. Prism Electric was the More »
Austin-Bergstrom International Airport (ABIA) Terminal East Infill is a design-build project with scope consisting of a 56,000 sf, four-story addition, and 31,000 square feet of renovation. The project reshaped the airport entrance, expanded existing passenger processing capabilities for ticketing, customs, baggage handling, and added a new passenger security screening checkpoint More »
This project consists of a ground up hospital, inpatient | outpatient clinics, parking garage, and central utility plant. The overall project totals to 937,000 sq.ft. with multiple GMPs and phases. Electrical Scope: Prism provided design-assist services for scopes still in the design process while early scopes were already under construction. More »
This project sits on a green field site at the Hwy 183 Toll Road and Avery Ranch Blvd. The new hospital is comprised of a new 141,000 square foot hospital. The hospital offers services including: 36 Universal beds; 4 O.R.’s (2 Equipped); 2 Endoscopy; 2 Minor Procedure Rooms; 20 ED More »