Winstar World Casino Hotel & Spa

This project includes a new 16-story, 217,000-square-foot hotel and spa facility, featuring 302 guest rooms along with luxury spa amenities. Power Distribution The electrical scope includes a 3000-amp, 277/480V switchboard feeding 56 panelboards and 17 transformers ranging from 75 kVA to 112.5 kVA, supporting the building’s full electrical load. Lighting More »

St. Mark’s Zierk Athletic Center

Prism Electric provided full electrical services for the new 77,000-square-foot Marksman Athletic Complex, which includes a competition gymnasium, natatorium, training rooms, locker rooms, offices, and tennis center. Power Distribution Scope included a new 2000-amp service and main switchboard feeding 13 panelboards, one 400-amp distribution board, and five transformers to support More »

Baylor Scott and White Medical Center – Pflugerville Hospital MC Clinic (MOB)

This ground-up project includes the construction of a new three-story, 75,000 sq. ft. Medical Office Building for Baylor Scott & White. Levels 1 and 2 feature full interior buildouts, while Level 3 is delivered as core and shell, ready for future development. Our electrical scope includes a new 3000-amp service More »

Baylor Scott and White Medical Center – Pflugerville Hospital Expansion

This multi-phase project includes a major expansion and renovation across several key areas of the hospital: Level 1: Upgraded and expanded the Emergency Department, including new CT Scan, Nuclear Medicine, and Radiology spaces. Level 2: Added a new Cath Lab, IR Lab, and expanded Sterile Processing to support Operating Room More »

Fort Worth Convention Center – Phase 1

Prism Electric is proud to deliver a full-scope electrical solution for the Phase 1 expansion and modernization of the Fort Worth Convention Center. Our scope of work includes: Power Distribution Installation of a new 4000A electrical service featuring a 640-foot Busway system. This phase also includes panelboard and transformer installations, More »

TI Sherman Security & Pathways

Telecommunication Cable Tray and Low Voltage Pathways. Provided and installed a turn key security system.

The Kitchen: American Bistro

Tenant improvement of existing double height single story shell space into two story restaurant.

Saint Francis South Central Utility Plant

Prism Electric was responsible for a comprehensive overhaul of the electrical infrastructure at St. Francis Hospital. This included replacing the entire electrical distribution system, upgrading the emergency power system, and installing new power generation and distribution equipment. Additionally, Prism provided electrical power for new HVAC systems, implemented advanced lighting and More »

NRHS Healthplex

Prism Electric played a critical role in the Norman Regional Healthplex expansion, a cornerstone of the system’s $300 million Inspire Health Strategic Plan. Our electrical expertise transformed the 316,000-square-foot facility into a state-of-the art healthcare hub, including a 96-bed critical care tower, advanced ambulatory care center, and expanded emergency department. More »

Baylor Scott & White Medical Center – Frisco at PGA Parkway

Ground-up construction for a new full-service hospital in the fast-growing Frisco, Texas area. The hospital is 340,000 sq.ft. and contains an emergency department, diagnostic imaging, pharmacy, pre and post-op, surgery suites, labor and delivery suites, and 80+ patient rooms. The remote CUP is 12,000 sq.ft.

Dell Children’s Medical Center – 4th Bed Tower

The fourth patient tower will add 72 rooms for acute care and allow Dell Children’s to serve an additional 1,500 patients each year. The tower consists of: 24 beds for new Pediatric Intensive care Unit (PICU) 24 beds for in-patient Oncology/Hematology 24 beds for Acute Care including a simulation lab More »

Shannon Medical Center West Expansion

Tower expansion to an existing active hospital. Electrical distribution fed from the existing hospital requiring coordination and planning for 12 separate shutdowns. 3,000 Amp service for new remote CUP building requiring distribution and control conduits installed on a utility bridge, above a major roadway. 500kW generator with 10,000 gallon fuel More »