Prism Electric was tasked by the Sheldon Independent School District to devise an LED solution for the two gymnasiums at M.R. Null Middle School. The school was built in 2009 and installed multi-lamp compact fluorescent high bay fixtures in lieu of traditional metal halide fixtures as an attempt to save More »
Prism Electric was contacted in the summer of 2018 by JP Hart Lumber to assess the existing lighting system and offer a solution for an LED upgrade. After conducting the field audit, Prism discovered many challenges and deficiencies with their existing system. The light fixtures included a mix of 250/400W More »
Prism Electric recently completed the lighting system upgrade at Texas A&M University Health Science Center’s 1020 Holcombe Campus in the Houston Medical District. The parking garage is dedicated to the adjacent building undergoing a major renovation for the university’s bio-engineering department but is also used for public parking during construction. More »
The Reliant Stadium Screen consists of a series of connected boards each measuring 52 feet high by 277 feet wide for a total of 14,549 feet packed with 5.28 million pixels. Prism provided conduit, cabling and electrical connections for this impressive screen and our service division is on site at More »